Two-stage tendering and ECI bring the contractor in while the design can still change. Here’s how the two stages work, the JCT PCSA and NEC4 Option X22, the real pros and cons, and how a QS protects value when most of the price is no longer in competition.
Compensation events are how NEC4 deals with change, delay and cost together. Here’s the notification time bar, the quotation timetable, how Defined Cost and the dividing date drive assessment, and the traps for both contractor and employer QSs.
What 5D BIM really means for a cost manager: how model objects link to NRM cost structures through IFC and classification, what the model won’t give you, and a practical checklist for QSs.
Modular and offsite construction doesn’t just make a project cheaper or dearer – it moves the money. Here’s how the MMC categories, PMV, preliminaries, design freeze, off-site payments and the Construction Act change a QS’s cost plan.
An extension of time and a loss and expense claim are separate entitlements under JCT, with different trigger events and notice rules. Here’s how the JCT 2024 mechanism works, why FES v HFD makes notice a likely condition precedent, and what a recoverable claim needs.